Quick and easy assembly, reconfiguration and dismantling.

Construction and assembly

Assembly

We place great importance on correct and reliable installation and remain available as your point of contact long after the project is complete.

Quick and easy assembly, reconfiguration and dismantling.

approx. 120 minutes

Is all our experts need to assemble the WORLD CUP Modular Pumptrack

Take a look at the

Construction diary

Construction diary: Nordenham gets a Park Edition made of fiberglass

Extra-Wide, Sea-Blue Waves for a German Costal Community

View details

Construction diary: Berlin-Neukölln gets a new concrete pumptrack

Germany's first URBAN EDITION Modular Pumptrack was installed in just 5 days!
View details

Layouts can be expanded, adapted and reconfigured over time, allowing the facility to evolve alongside changing needs, available space and budgets.